PRIVATE FLEETS
New York
Manhattan Beer – Wyandanch, NY
In 2020, engineered/designed and constructed a duplex CNG Station with priority panel, dual hose dispenser and fuel management system. This allows the site to provide over 250,000 GGE’s/yr. for their delivery trucks and is an upgrade from the smaller station built in 2008.
Click on any photo to see a large slideshow.
Manhattan Beer – Suffern, NY
This was a phased project in 2018 & 2019; due to a very limited available space, we engineered/designed a platform configuration for this project, including planning board presentation with traffic studies to secure approvals before building department approvals. We supplied and constructed a duplex CNG Station with a priority panel, dual hose dispenser, and fuel management system. This allows the site to provide over 250,000 GGE’s/yr. for their delivery trucks.
Custom Designed Elevated Platform – Duplex High Volume CNG Compressors, Inlet Dryer, Priority Panel & ASME Tubes
Manhattan Beer – Bronx, NY
2012 we relocated the customer’s original 1998 CNG Station at another property in the Bronx. This involved securing FDNY approvals, Department of Buildings permit application, PLC upgrades, and respective software, plus all site upgrades.
2017 we refurbished the CNG station previously installed at their Brooklyn site and integrated it into their original 1998 duplex, so they now had four units to support their CNG needs, including a remote fueling island.
Click on any photo to see a large slideshow.
Manhattan Beer – Brooklyn, NY
2004, designed and constructed a duplex CNG Station with FDNY approved application. Equipment was relocated to the Bronx in 2014 with respective PLC upgrades (DF Automation) site work and FDNY applications.
New Jersey
Suburban Carting – Fairfield, NJ
This project was in two phases, allowing for a duplex compressor & 40 time-fill posts. The initial phase was in 2013, was for a single compressor unit and 18 time-fill positions. Air & Gas Technologies engineered an elevated platform to house a duplex system, with all the electric feed, main disconnect, soft-starters, and communication panel on an extended section of the platform. The platform resolved local/state approvals because it’s a designated flood zone. This duplex system provides a total of 320 SCFM with two (2) 125 HP Bauer compressors fueling 40 refuse trucks.
Click on any photo to see a large slideshow.
Waste Management – Toms River, NJ
Public Fast-Fill Island at the Roadway entrance to the Secured Yard housing multiple Time-Fill Positions
Facility Provided in conjunction with New Jersey Natural Gas
Pennsylvania
Waste Management – Dunmore, Penn Argyl & Gilbertsville
2015 to Present: Refuse company has numerous locations throughout the country, and we have supported their projects from an installation and service perspective. At one location, we were hired to replace and install new high-pressure stainless tubing and electrical conduit seals that were previously installed by another contractor who was awarded the project. This was due to the system incurring multiple leaks, incomplete or cracked conduit seals, and not installing material with certified technicians and per the manufacturer’s specifications. In other locations, we have provided routine service and are often called in by the original equipment manufacturer to remedy non-conforming or non-functional components or equipment.
Click on any photo to see a large slideshow.
L.T. Verrasto Beer Distributer – Old Forge, PA
2016 Designed & built a combination 10-position time-fill with public access fast-fill with credit card fuel management system. The site was built with the capacity for three compressors. The initial phase included one compressor, inlet dryer, priority panel & all electric & piping for two additional compressors and up to 15 more time-fill posts.
Click on any photo to see a large slideshow.
Connecticut
All Waste – Essex CT
Click on any photo to see a large slideshow.